Integrated Buried Wastewater Treatment Equipment
Integrated Buried Wastewater Treatment Equipment

The integrated buried wastewater treatment equipment is a kind of equipment that integrates the hydrolysis acidification tank, Grade I and Grade II contact oxidation tank, secondary sedimentation tank and sludge tank, and carries on the blast aeration in the Grade I and Grade II contact oxidation tank, which combines the contact oxidation technology with the activated sludge technology effectively. It has the advantages of both technologies and overcomes their shortcomings, so as to improve the wastewater treatment level. When this equipment is buried under the ground, the upper part of the area can be used for greening. So, the factory will cover less area and have less the buildings on the ground.
Ⅰ.Design Principle
The integrated buried wastewater treatment equipment is mainly designed to treat sanitary wastewater and similar industrial organic wastewater. The water quality parameters are calculated according to the general quality of the sanitary wastewater, and the inlet water BOD5 is calculated based on 200mg/l.
The main component: 1. Hydrolysis acidification tank; 2. Contact oxidation tank; 3. Sedimentation tank; 4. Disinfection treatment tank; 5. Sludge aerobic digestion tank.
1. Hydrolysis Acidification Tank
This process is a kind of pre-treatment before the wastewater treatment, and it will make wastewater have certain anaerobic fermentation to improve its biodegradability. It is an important step before wastewater treatment, which can directly affect the wastewater treatment efficiency and processing time in the later stage and greatly improve the wastewater treatment efficiency and reduce the consumption.
2. Contact Oxidation Tank
The contact oxidation tank is divided into several grades according to different pollution degree of water treatment, for example, common contact oxidation tank and enhanced contact oxidation tank. They are distinguished according to the processing time. It’s better to use common contact oxidation tank when processing time is not more than 4 hours, and it’s better to use enhanced contact oxidation tank when the processing time is 4 - 6 hours. After the wastewater is treated in the hydrolysis acidification tank, it will automatically flow to the contact oxidation tank for biochemical treatment. Most of the organic matters in the raw wastewater is degraded and purified here. The aerobic bacteria take the fillers as the carrier and uses the organic matters in the wastewater as the food to decompose the organic matters into inorganic salts so as to achieve the purpose of purification. The aerobic bacteria need enough oxygen to survive, that is, there should be sufficient dissolved oxygen in the wastewater in order to achieve the purpose of biochemical treatment. The air in the aerobic digestion tank is supplied by the fan, and a new elastic stereoscopic filler is used inside the tank. This kind of filler has a large surface area ratio and a long service life, easy to hold the film, with high corrosion resistance. The bottom of the tank is equipped with the rotary aerator that can increase the transfer rate of dissolved oxygen. This aerator also has the advantages of light weight, not aging, hard to be blocked, and long service life, etc. The air-water ratio of the contact oxidation tank is about 12:1. (0.5-5 m/h contact oxidation tank is the Grade Ⅱ contact oxidation tank)
3. Sedimentation Tank
After the wastewater is treated in the biological contact oxidation tank, the outlet water flows into the sedimentation tank, and the biofilm and some organic and inorganic particles are removed here. The sedimentation tank is based on gravity. When wastewater containing suspended substances flows from bottom to top, the suspended substances will precipitate by gravity. The upper part of the sedimentation tank is equipped with adjustable outlet water weir to adjust the water level; The lower part is provided with conical sedimentation zone and sludge air-lift device. The air source is supplied by a fan, and the sludge is transported to the aerobic digestion tank by air lift device.
4.Disinfection Treatment Tank
Disinfection treatment tank is based on TJ14- 74, and its standard retention time is 30 min. If the wastewater is from the hospital, the retention time will add another 1-1.5 h. Our company adopts chlorine dioxide disinfection device, and disinfection tank and disinfection device can change the quantity of the disinfectant according to the quantity of the treated water. That’s to say, users can add proper amount of disinfectant based on the amount of the treated water. Other equipment can also be prepared separately. (For example, disinfection tank and disinfection device can be ignored in the treatment of industrial wastewater.)
5. Sludge Aerobic Digestion Tank
The residual sludge discharged from the sedimentation tank is treated and stabilized by aerobic digestion in the tank to reduce the volume of sludge and improve the stability of sludge. The amount of sludge after aerobic digestion is relatively small. When cleaning, the sludge suction truck can be used to enter the bottom of the sludge tank from the inspection hole to suck the sludge and transport the sludge to other places (This cleaning can be done every half a year.). There is a clean water reflux unit on the top of the sludge aerobic digestion tank which can make the clean water enter into the hydrolysis acidification tank.